La Revilla
Year 1995. Orejana, Segovia, Castile and Leon. Funded by the Junta de Castilla y León. Carried out by La Paloma Segoviana. 2.02 hectares. Abandoned silica sand mine. Designs by J.F. Martín, J. Pedraza and A. Díez. Construction direction by J.F. Martín and A. Díez. Pre-restoration image, January 1995 (J.F. Martín). Recent image, May 2020 (DGDRONE). Publication: Martín Duque et al. (1998, 2010a)
La Higuera
Year 2008. Espirdo, Segovia, Castile and Leon. Funded by the Junta de Castilla y León and executed by Juan Gómez. 1.03 hectares. Abandoned clay mine. Designs by J.F. Martín, J.M. Nicolau and C. Martín. Construction direction by J.F. Martín. Pre-restoration image, October 2008 (Paisajes Españoles). Recent image, May 2020 (DGDRONE). Publication: Martín Duque et al. (2010b)
Somolinos
El Machorro
Years 2012 and 2014. Poveda de La Sierra, Guadalajara, Castile-La Mancha. Funded by CAOBAR. Carried out by CAOBAR and Excavaciones Félix Moya. 1.24 hectares. Active mine of kaolin sands. Designs by I. Zapico and J.F. Martín. Construction direction by J.F. Martín, I. Zapico, M. Tejedor, C. de Francisco, S. Nyssen and M. Álvarez. Pre-restoration image, July 2012 (J.F. Martín). Recent image, July 2023 (J.F. Martín). Publication: Zapico et al. (2018)
Aurora
Pastor I
Riotinto
TECMINE (East)
Years 2018-2019. Ademuz, Valencia, Valencian Community. Funded by the EU LIFE program (TECMINE). Executed by SIBELCO. 1.12 hectares. Abandoned kaolin sands mine. Designs and Construction direction by J.F. Martín and M. Tejedor. Pre-restoration image, July 2018 (Paisajes Españoles). Post-restoration image, April 2019 (VAERSA) Publication: Martín Duque et al. (2019a)
TECMINE (West)
Years 2018-2019. Ademuz, Valencia, Valencian Community. Funded by the EU LIFE program (TECMINE). Executed by SIBELCO. 4.87 hectares. Active mine of kaoliniferous sands. Designs and construction direction by J.F. Martín and M. Tejedor. Pre-restoration image, July 2018 (Paisajes Españoles). Image, near completion of geomorphological remodeling and soil paving, March 2019 (VAERSA). Publication: Martín Duque et al. (2019a)
Nueva Julia
San Luis
Corta Mª Pilar VII
Lousal
Year 2021. Grándola, Alentejo, Portugal. Funded by the EU LIFE program (RIBERMINE). Executed by J.F. Da Silva Carrinhos. 1.83 hectares. Abandoned pyrite mine. Designs by M. Tejedor and J.F. Martín. Construction direction by J.F. Martín, R. Sánchez, M. Tejedor, A. Pinto and M. Silva. Pre-restoration image, August 2021 (TOPOSFERICA). Post-restoration image, April 2024 (Bruno Gonçalves). Publication: Sánchez-Donoso et al. (2024)
Illescas
Fuentes de León
Year 2023. Fuentes de León, Badajoz, Extremadura. Funded by Junta de Extremadura. Executed by AREX S.L. 2.05 hectares. Inert waste landfill. Design and construction direction by J.F. Martín and M. Tejedor. Pre-restoration image, reconstruction for 2019, from IGN. Post-restoration image, January 2024 (AREX S.L.). Publication: Martín Duque et al. (2019b)
Alpedrete Norte
Year 2023. Alpedrete, Community of Madrid. Funded by the EU (Next Generation funds). Executed by TRAGSA. 9 hectares (total project). Abandoned granite quarries. Design and construction direction by J.F. Martín and M. Tejedor. Pre-restoration image, November 2023 (TRAGSA). Post-restoration image, April 2024 (Community of Madrid). Publication: Romero de Lara et al. (2024)
Alpedrete Sur
Virgen de la Torre
LIFE RIBERMINE - Santa Engracia
Years 2020 to 2024. Peñalén, Guadalajara, Castile-La Mancha. Funded by the EU LIFE program (RIBERMINE). Executed by CAOBAR, Excavaciones Félix Moya and TRAGSA. 11.06 hectares. Abandoned mine of kaoliniferous sands. Designs by M. Tejedor and J.F. Martín. Construction direction by J.F. Martín, M. Tejedor, C. Martín, C. de Francisco and M. Álvarez. Pre-restoration image, March 2020 (DIEDRO). Final restoration image, May 2024 (M.A. Langa). Publication: Martín Duque et al. (2022)
Talud Royal de Santa Engracia
San Quintín Oeste
Years 2023 and 2024. Villamayor de Calatrava, Ciudad Real, Castile-La Mancha. Funded by the European Union (Next Generation funds). Executed by TRAGSA. 11.84 hectares. Metallic mining. Designs by J.F. Martín, M. Tejedor and I. Zapico. Construction direction by J.F. Martín and M. Tejedor. Pre-restoration image, June 2022 (Pedro G. Zamorano, UCLM). Image restoration work in progress, July 2024 (TRAGSA).
San Quintín Este
Years 2023 and 2024. Villamayor de Calatrava, Ciudad Real, Castilea-La Mancha. Funded by the European Union (Next Generation funds). Executed by TRAGSA. 25.67 hectares. Metallic mining. Designs by José F. Martín, M. Tejedor and I. Zapico. Construction direction, J.F. Martín and M. Tejedor. Pre-restoration image, June 2022 (Pedro G. Zamorano, UCLM). Restoration, geomorphic design superimposed on DTM and orthophoto.