La Revilla


Year 1995. Orejana, Segovia, Castile and Leon. Funded by the Junta de Castilla y León. Carried out by La Paloma Segoviana. 2.02 hectares. Abandoned silica sand mine. Designs by J.F. Martín, J. Pedraza and A. Díez. Construction direction by J.F. Martín and A. Díez. Pre-restoration image, January 1995 (J.F. Martín). Recent image, May 2020 (DGDRONE). Publication: Martín Duque et al. (1998, 2010a)
La Higuera


Year 2008. Espirdo, Segovia, Castile and Leon. Funded by the Junta de Castilla y León and executed by Juan Gómez. 1.03 hectares. Abandoned clay mine. Designs by J.F. Martín, J.M. Nicolau and C. Martín. Construction direction by J.F. Martín. Pre-restoration image, October 2008 (Paisajes Españoles). Recent image, May 2020 (DGDRONE). Publication: Martín Duque et al. (2010b)
Somolinos


El Machorro


Years 2012 and 2014. Poveda de La Sierra, Guadalajara, Castile-La Mancha. Funded by CAOBAR. Carried out by CAOBAR and Excavaciones Félix Moya. 1.24 hectares. Active mine of kaolin sands. Designs by I. Zapico and J.F. Martín. Construction direction by J.F. Martín, I. Zapico, M. Tejedor, C. de Francisco, S. Nyssen and M. Álvarez. Pre-restoration image, July 2012 (J.F. Martín). Recent image, July 2023 (J.F. Martín). Publication: Zapico et al. (2018)
Aurora


Pastor I


Riotinto


Year 2024. Riotinto Mines, Huelva, Andalusia. Funded and executed by ATALAYA MINING. 6.5 hectares. Active copper mine. Final, constructible designs, by J.F. Martín and M. Tejedor. Construction direction J.F. Martín and M. Tejedor. Pre-restoration image, September 2021 (ATALAYA MINING). Post geomorphic reshaping, December of 2024 (ATALAYA MINING).
TECMINE (East)


Years 2018-2019. Ademuz, Valencia, Valencian Community. Funded by the EU LIFE program (TECMINE). Executed by SIBELCO. 1.12 hectares. Abandoned kaolin sands mine. Designs and Construction direction by J.F. Martín and M. Tejedor. Pre-restoration image, July 2018 (Paisajes Españoles). Post-restoration image, April 2019 (VAERSA) Publication: Martín Duque et al. (2019a)
TECMINE (West)


Years 2018-2019. Ademuz, Valencia, Valencian Community. Funded by the EU LIFE program (TECMINE). Executed by SIBELCO. 4.87 hectares. Active mine of kaoliniferous sands. Designs and construction direction by J.F. Martín and M. Tejedor. Pre-restoration image, July 2018 (Paisajes Españoles). Image, near completion of geomorphological remodeling and soil paving, March 2019 (VAERSA). Publication: Martín Duque et al. (2019a)
Nueva Julia


San Luis


Corta Mª Pilar VII


Lousal


Year 2021. Grándola, Alentejo, Portugal. Funded by the EU LIFE program (RIBERMINE). Executed by J.F. Da Silva Carrinhos. 1.83 hectares. Abandoned pyrite mine. Designs by M. Tejedor and J.F. Martín. Construction direction by J.F. Martín, R. Sánchez, M. Tejedor, A. Pinto and M. Silva. Pre-restoration image, August 2021 (TOPOSFERICA). Post-restoration image, April 2024 (Bruno Gonçalves). Publication: Sánchez-Donoso et al. (2024)
Illescas


Fuentes de León


Year 2023. Fuentes de León, Badajoz, Extremadura. Funded by Junta de Extremadura. Executed by AREX S.L. 2.05 hectares. Inert waste landfill. Design and construction direction by J.F. Martín and M. Tejedor. Pre-restoration image, reconstruction for 2019, from IGN. Post-restoration image, January 2024 (AREX S.L.). Publication: Martín Duque et al. (2019b)
Alpedrete Norte


Year 2023. Alpedrete, Community of Madrid. Funded by the EU (Next Generation funds). Executed by TRAGSA. 9 hectares (total project). Abandoned granite quarries. Design and construction direction by J.F. Martín and M. Tejedor. Pre-restoration image, November 2023 (TRAGSA). Post-restoration image, April 2024 (Community of Madrid). Publication: Romero de Lara et al. (2024)
Alpedrete Sur


Virgen de la Torre


LIFE RIBERMINE - Santa Engracia


Years 2020 to 2024. Peñalén, Guadalajara, Castile-La Mancha. Funded by the EU LIFE program (RIBERMINE). Executed by CAOBAR, Excavaciones Félix Moya and TRAGSA. 11.06 hectares. Abandoned mine of kaoliniferous sands. Designs by M. Tejedor and J.F. Martín. Construction direction by J.F. Martín, M. Tejedor, C. Martín, C. de Francisco and M. Álvarez. Pre-restoration image, March 2020 (DIEDRO). Final restoration image, May 2024 (M.A. Langa). Publication: Martín Duque et al. (2022)
Talud Royal de Santa Engracia


San Quintín Oeste


Years 2023 and 2024. Villamayor de Calatrava, Ciudad Real, Castile-La Mancha. Funded by the European Union (Next Generation funds). Executed by TRAGSA. 11.84 hectares. Metallic mining. Designs by J.F. Martín, M. Tejedor and I. Zapico. Construction direction by J.F. Martín and M. Tejedor. Pre-restoration image, June 2022 (Pedro G. Zamorano, UCLM). Image restoration work in progress, July 2024 (TRAGSA).
San Quintín Este


Years 2023 and 2024. Villamayor de Calatrava, Ciudad Real, Castilea-La Mancha. Funded by the European Union (Next Generation funds). Executed by TRAGSA. 25.67 hectares. Metallic mining. Designs by José F. Martín, M. Tejedor and I. Zapico. Construction direction, J.F. Martín and M. Tejedor. Pre-restoration image, June 2022 (Pedro G. Zamorano, UCLM). Restoration, geomorphic design superimposed on DTM and orthophoto.